Work has started on a waste water treatment project at coastal areas on the eastern side of Son Tra and Ngu Hanh Son districts in Da Nang.
Work starting on a wastewater collection system in residential areas on Phan Tu Street, My An Ward, Ngu Hanh Son District
In particular, 26,143m-long and self-flowing pipelines with each diameter of between 200mm and 900mm will be installed along Ho Nghinh, Le Huu Trac, Tran Bach Dang, and Vo Nguyen Giap.
Meanwhile, second-level pipelines will be installed along Pham Van Dong, Duong Dinh Nghe, Ha Chuong, Nguyen Cong Tru, Vo Van Kiet, Nguyen Thien Ke, Le Huu Trac, To Hien Thanh, Ho Nghinh, Lam Hoanh, Nguyen Van Thoai, Do Ba, Hoang Ke Viem, Phan Tu, Ba Huyen Thanh Quang, Tran Van Du, and Ho Xuan Huong.
In addition, secondary pipelines will be installed along these streets to collect all domestic wastewater in these areas.
Also, the focus will be on building 4 wastewater pumping stations in the city.
Developed by the Management Board for the city’s Priority Infrastructure Investment Projects, the project is expected to be completed in April 2020.
DA NANG Today
TỔNG ĐÀI DỊCH VỤ CÔNG: (0236) 1022 hoặc *1022, miễn phí phục vụ
1. Đường dây nóng tiếp nhận ý kiến phản ánh, góp ý của tổ chức, công dân.
2. Hướng dẫn, giải đáp quy định, chính sách, thông tin kinh tế – xã hội.
3. Hướng dẫn thực hiện thủ tục hành chính, dịch vụ công trực tuyến.
4. Cung cấp thông tin về hỗ trợ doanh nghiệp; quy định, chính sách hỗ trợ Khoa học công nghệ, đổi mới sáng tạo và chuyển đổi số.
5. Cung cấp thông tin về du lịch, sự kiện Văn hóa – Thể thao.
6. Cung cấp dịch vụ Tổng đài CSKH, nhắn tin CSKH, truyền thông, sự kiện và các dịch vụ tư vấn khác…


English