A section of railway station running through Đà Nẵng City is built with a protective handrail system. — VNS Photo Công Thành
ĐÀ NẴNG — Đà Nẵng plans to build a 1.2km safe lane for local residents at railroad crossing sites along a section of the north-south railway system from Hòa Cầm flyover bridge to Cầu Đỏ bridge in Cẩm Lệ District, with total investment of VNĐ39 billion (US$1.7 million).
The city aims to complete the 5m wide lane in 2019 to offer safe passage for people living along the tracks through the city.
The city has already completed a section from Huế Junction to Hòa Cầm flyover with funds of VNĐ26 billion ($1.1 million).
According to the city’s transport department, Đà Nẵng has approved a plan for safe traffic at railway crossings with total length of 5.5km and funds of VNĐ145 billion ($6.4 million).
In 2015, the city put into operation a three-level rail and road flyover at Huế Junction.
The national railway system runs 25km through Đà Nẵng, creating seven crossings.
Đà Nẵng plans to move the railway station from the city’s centre to suburban Liên Chiểu District in 2022.
Source: vietnamnews.vn
TỔNG ĐÀI DỊCH VỤ CÔNG: (0236) 1022 hoặc *1022, miễn phí phục vụ
1. Đường dây nóng tiếp nhận ý kiến phản ánh, góp ý của tổ chức, công dân.
2. Hướng dẫn, giải đáp quy định, chính sách, thông tin kinh tế – xã hội.
3. Hướng dẫn thực hiện thủ tục hành chính, dịch vụ công trực tuyến.
4. Cung cấp thông tin về hỗ trợ doanh nghiệp; quy định, chính sách hỗ trợ Khoa học công nghệ, đổi mới sáng tạo và chuyển đổi số.
5. Cung cấp thông tin về du lịch, sự kiện Văn hóa – Thể thao.
6. Cung cấp dịch vụ Tổng đài CSKH, nhắn tin CSKH, truyền thông, sự kiện và các dịch vụ tư vấn khác…


English