As per request by the Da Nang administration, the municipal Department of Transport will direct consulting units to focus on carefully studying the traffic arrangement of a intersection north of the existing Hoa Xuan Bridge, and the capital source for the expansion of the bridge and its approach roads.
In detail, focus will be expanding the bridge in tandem with constructing a tunnel along riverside Thang Long Street and a steel overpass along Cach Mang Thang Tam Street. The total cost is expected to be about VND 410 billion.
This option is consistent with the Prime Minister –approved adjustments to the Da Nang Master Plan by 2030, with a vision towards 2045.
According to the Department of Transport, traffic congestion north of the bridge, exactly at the intersection of Le Thanh Nghi – Cach Mang Thang Tam – Thang Long – an approach road leading to the bridge, has appeared over the past years, especially during peak hours.
Through the survey, the longest vehicle queuing length is about 300 – 400m. Traffic through the intersection during peak hours is currently about 4,000 cars / hour, exceeding the capacity of the self-regulating intersection. Therefore, it is necessary to adjust the traffic arrangement at this cluster of traffic nodes in a bid to improve traffic movement.
DA NANG Today
TỔNG ĐÀI DỊCH VỤ CÔNG: (0236) 1022 hoặc *1022, miễn phí phục vụ
1. Đường dây nóng tiếp nhận ý kiến phản ánh, góp ý của tổ chức, công dân.
2. Hướng dẫn, giải đáp quy định, chính sách, thông tin kinh tế – xã hội.
3. Hướng dẫn thực hiện thủ tục hành chính, dịch vụ công trực tuyến.
4. Cung cấp thông tin về hỗ trợ doanh nghiệp; quy định, chính sách hỗ trợ Khoa học công nghệ, đổi mới sáng tạo và chuyển đổi số.
5. Cung cấp thông tin về du lịch, sự kiện Văn hóa – Thể thao.
6. Cung cấp dịch vụ Tổng đài CSKH, nhắn tin CSKH, truyền thông, sự kiện và các dịch vụ tư vấn khác…


English