36.7 billion VND for building automatic wastewater monitoring system

0:00

A joint bid from the HAWACO Mechanical and Electrical Co Ltd and ANSV Telecommunication Equipment Co Ltd has won the right to build automatic monitoring systems totalling 36.7 billion VND at wastewater treatment plants in Da Nang.

In particular, the successful contractors will install a system to connect the existing Supervisory Control and Data Acquisition (SCADA) systems of the wastewater collection pump stations across the city.

A new automatic monitoring system will be built to supervise the quality of wastewater discharged from the Son Tra Wastewater Treatment Plant. This new system will be connected with the existing SCADA systems of the Hoa Xuan, Son Tra, Phu Loc and Lien Chieu wastewater treatment plants.

In addition, the successful contractors will be responsible for building monitoring systems at Combined Sewer Overflows (CSOs) to issue early threat warning about untreated wastewater overflows into the environment, and constructing flow measurement systems at wastewater collection stations in order to monitor, manage, and evaluate the capacity of the wastewater collection at various points.

The project is expected to be implemented within 12 months.


By DA NANG Today / DA NANG Today

TỔNG ĐÀI DỊCH VỤ CÔNG: (0236) 1022 hoặc *1022, miễn phí phục vụ  
1. Đường dây nóng tiếp nhận ý kiến phản ánh, góp ý của tổ chức, công dân.
2. Hướng dẫn, giải đáp quy định, chính sách, thông tin kinh tế – xã hội.
3. Hướng dẫn thực hiện thủ tục hành chính, dịch vụ công trực tuyến.
4. Cung cấp thông tin về hỗ trợ doanh nghiệp; quy định, chính sách hỗ trợ Khoa học công nghệ, đổi mới sáng tạo và chuyển đổi số.
5. Cung cấp thông tin về du lịch, sự kiện Văn hóa – Thể thao.
6. Cung cấp dịch vụ Tổng đài CSKH, nhắn tin CSKH, truyền thông, sự kiện và các dịch vụ tư vấn khác…

Để lại một bình luận

Email của bạn sẽ không được hiển thị công khai. Các trường bắt buộc được đánh dấu *