14 billion VND for building anti-saline intrusion dam on Cam Le River

0:00

On Wednesday, work started on temporary anti-saline intrusion dam near the Nguyen Tri Phuong Bridge which crosses the Cam Le River.

Funded by the Da Nang Water Supply Company (DAWACO), the over 14 billion VND project, about several kilometers from the downstream section of the Cau Do Bridge, aims to prevent the Cau Do River from saline intrusion, hereby ensuring enough water for local residents in the forthcoming Tet holiday and peak dry season.

The 127m-long dam will have between 3m and 5m in depth from the water surface to the bottom of the river.

It will be built from about 400 tonnes of larssen steel sheet piles which are imported from Japan and South Korea.

The project is expected to be completed before the Lunar New Year.


Source: Da Nang Today

TỔNG ĐÀI DỊCH VỤ CÔNG: (0236) 1022 hoặc *1022, miễn phí phục vụ  
1. Đường dây nóng tiếp nhận ý kiến phản ánh, góp ý của tổ chức, công dân.
2. Hướng dẫn, giải đáp quy định, chính sách, thông tin kinh tế – xã hội.
3. Hướng dẫn thực hiện thủ tục hành chính, dịch vụ công trực tuyến.
4. Cung cấp thông tin về hỗ trợ doanh nghiệp; quy định, chính sách hỗ trợ Khoa học công nghệ, đổi mới sáng tạo và chuyển đổi số.
5. Cung cấp thông tin về du lịch, sự kiện Văn hóa – Thể thao.
6. Cung cấp dịch vụ Tổng đài CSKH, nhắn tin CSKH, truyền thông, sự kiện và các dịch vụ tư vấn khác…

Để lại một bình luận

Email của bạn sẽ không được hiển thị công khai. Các trường bắt buộc được đánh dấu *